Optimal days working and days off work
I have a office worker that complains from asthma exacerbation during work by the air conditioning. I checked the literature that says peak flow measures must be done 2 week at work and 2 weeks off work but Oasys tutorial does not define the optimal ratio of days working and days off at peak flow measures. Wich proportion would give the best results?
|
Please sign in or register to add your thoughts.